The house is moving along, the insulation is up, the stone at the bottom of the door is in and they are doing the last layer of stucco on the inside walls (the part that they then pain). Then they will be putting up a fake wall thing in our bedroom for our closet area and then the plumber will be coming to lay down the floor heating.
Still hope to be in during the holidays (between Christmas and the 8the of January).





Forgot to mention that they are also doing restoration work on the balcony =).